Construction of bomb shelters
The construction company Kramelitbud implements projects for the construction, overhaul and modernization of bomb shelters, shelters and protective structures for civilian purposes. We create spaces that save lives while meeting all the requirements of safety, inclusion and comfort. Our solutions help keep communities safe in times of crisis.

In times of armed threats and emergencies, the availability of modern shelter is a critical security condition. Kramelitbud specializes in a full cycle of work on the arrangement and reconstruction of bomb shelters: from mobilization of resources to commissioning of the facility. We strictly adhere to building codes, DBN standards V.2. 2-5:2023 and the principles of inclusiveness, which is especially important for our partners in the humanitarian sector.
Our work includes engineering training, laying communications, ventilation systems, fire safety and heating, a full range of finishing and installation works, installation of lifts, ramps, emergency exits. We ensure efficient implementation within a well-defined budget and deadlines, taking care of every meter of safe space.



Stages of construction or reconstruction of the bomb shelter
Creating a shelter is a multi-step process that requires technical precision, coordination, and adherence to strict regulations. Each project is carried out according to a transparent scheme, which guarantees the safety, reliability and efficiency of the space for protection.
Mobilization of resources
At the start of the project, we assemble a team of specialists, deliver equipment and building materials, and set up the construction site. We connect temporary water and electricity supply systems and prepare the site for the start of the main work.
Demolition work
We dismantle old structures and communications. We remove unsuitable materials, take away debris, and clean the premises or territory, creating a foundation for further stages.
Engineering communications
We install or upgrade power supply, water supply, sewage, and heating networks. All systems are designed with backup power and autonomous operation in emergency situations in mind.
Heating systems
We install efficient heating systems, whether centralized or autonomous. We install radiators and heaters, and insulate rooms to retain heat during cold periods.
Plumbing and electrical installation
We install plumbing equipment and connect water and sewage systems. At the same time, we perform electrical work: we install electrical panels, sockets, lighting, and emergency power systems.
Interior decoration
We carry out a full cycle of finishing works: we install drywall, finish walls and ceilings, perform waterproofing and floor reinforcement. We finish with painting, tiling, flooring, and door installation.
Ventilation systems and fire safety
We ensure air circulation through modern ventilation systems. We integrate air conditioning, fire alarm, warning, and emergency lighting systems for complete protection of shelter users.
Inclusivity: ramps, lifts, porches
We care about accessibility for everyone. We install ramps, lifts, wide entrances, handrails, and other elements that meet the requirements of DBN V.2.2-40:2018 for people with limited mobility.
Final works and commissioning of the facility
We complete the construction with final cleaning, checking all systems, and eliminating minor defects. We prepare the facility for operation and hand it over to the customer in a fully finished state.
Let's discuss your project?
Enter the phone number and managers will contact you and provide answers to all questions.
Portfolio of completed projects
We have experience in implementing complex technical projects in educational, healthcare and other critical infrastructure facilities. Our cases include work done in partnership with humanitarian organizations and local communities.
Overhaul of the school shelter
The object is located in the village. Mykolo-Komyshuvakha, Krasnohrad district, Kharkiv region. The term of work is 6 months.